![]() A wide variety of mobile asphalt plant for sale options are available to you, Chapter 1 - Fly Ash - An Engineering Material About 86% of these are Asphalt Mixers, 4% are Concrete Batching Plant. ![]() mobile asphalt plant for sale, mobile asphalt plant for saleĪ offers 361 mobile asphalt plant for sale products. While, using urbanite for a project requires extra human effort, it keeps waste concrete from filling up landfills and requires little or no production energy. One such material is urbanite, or broken up pieces of concrete that can be reused in a variety of ways. We at Stansteel take pride in our customer service and transparency, and are here to help you find the perfect equipment or plant. Search through our database of REFURBISHED and USED asphalt plants and equipment. YDHB Mobile Asphalt Mixing Plant Used Asphalt Plants and Equipment Listings Widely used in water conservancy project construction, bridge building etc. Mobile Asphalt Mixing Plant is convient for transporting asphalt place to place while mixing.The City requested HMB to provide a complete evaluation of the combined sewer, including CCTV, dye testing, lateral investigations and recommendations for future repairs.Civil mobile asphalt mixing plant ,used asphalt plant forģD Animation of Mobile Asphalt Mixing Plant at Work. Through routine system monitoring, FSD discovered a potential failure site in a very old brick construction combined sewer in downtown Frankfort. This was an ACEC award winning project in conjunction with the infrastructure and site work for the new KYTC building. of 12 inch sanitary sewer to provide sewer service to the New Kentucky Transportation Cabinet Building on Mero Street. Provide plans and specifications to construct approximately 1,200 L.F. This new line will allow a new point of access to the FSD system which will be on each individual property. Currently, many residents have service laterals that cross neighboring properties to discharge into the FSD main line. 8 inch gravity sewer on Shelby Street to provide an alternative for sewer lateral connection to the FSD system. ![]() HMB provided plans and specifications to install an approximately 310 L.F. HMB also prepared was a preliminary plan of the proposed sewer and appurtenances. HMB developed a construction cost estimate and total project cost estimate to determine the feasibility of providing public sewer service to the Winding Way area. The phase was funded with EPA and KIA grants and provided service to the new Westridge Elementary School. Both Phases of this project were regional in nature and completed in conjunction with both the Fiscal Court and the City Sewer Department. Phase 2- The Phase II Choateville Project consisted of approximately 7,500 feet of small diameter low pressure sewer collection main and 61 individual grinder pumps. HMB prepared plans and specifications for the design of new sanitary sewers, provided contract administration, preparation of preliminary engineering and cost estimates for a HUD/CDBG funding application, obtained necessary approvals and permits, conducted advertising and bidding and evaluation of contractors and construction observation and administration. Phase 1- The Phase I Choateville Area project involved 21,200 linear feet of 8 inch and 10 inch gravity sewer, 6,000 linear feet of 8 inch force main, 4,650 linear feet of 2 inch low pressure sewer main and 55 individual low pressure grinder pumps. HMB provided plans, specifications, advertising and bidding, construction administration and construction inspection to upgrade this storm water pump station, located on Penitentiary Branch, which is owned and operated by the City of Frankfort. The original pump station was constructed by the US Army Corps of Engineers (COE) in 1969 and upgraded to 210 cfs by the COE in 1996. HMB provided plans and specifications to upgrade the existing Jones Run Storm Water Pump Station from 210 cfs (94,250 gpm) to 360 cfs (161,570 gpm). Jones Run Storm Water Pump Station Upgrade HMB also provided engineering services for the initial 6.6 MGD WWTP, and all capacity expansion projects at the WWTP since its original construction. This project is complete and in operation. ![]() The expanded plant handles an average daily flow of 9.9 MGD, a peak daily flow of 24 MGD and a peak hourly flow of 17 MGD. HMB provided design and construction administration/inspection for a 3.3 MGD expansion to the wastewater treatment plant. Wastewater Treatment Plant Expansion Projects HMB has completed numerous projects for the Frankfort Sewer Department, including the following:
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |